Some of the detail then in the various photos reveals subtle details. For example, that yellow pipe attached overhead is the USA type gas pipe to connect our big propane tank stored in the bodega with our gas range up in the cocina (kitchen). You can also observe the difference in keeping lines on a grid vs cross structure (blue lines) as our now fired electrician did.
In the fourth photo, you'll see some angled pipes. What this does is allow for a merger of grey water to black water. There is valving which allows our grey water to flow into the grey water holding tank for local treatment in a bio-garden (yet to be built). Or the grey water can divert into the black water, and be treated by our septic system. This is a one way conversion, so we prevent black water from entering the grey water system...
Both the white grey water pipe, and the black colored black water pipe exit under the dry bodega (that angled wall you see in the last photo). When Gerardo's crew installs the grey water tank, it will be located just below the generator room. The septic will be put in the much flatter land downhill from the casa.
Doing all this helped reveal to us some details that ultimately will help us. For example, we had assumed we would complete the retaining wall off the entry patio all the way to the building (last photo). But instead, we will alter this so against the house we can build a walkway - and a stair way cut into the hill leading downhill with some sort of concrete blocks surface as a maintenance path to the water treatment systems. We have some ideas to slightly modify our concept of the outdoor shower that we'll firm up during our next trip (we think). BTW, this final photo not only shows where the outdoor shower/boot wash will be; but the windows you're looking at are (close to far) bathroom #2, first floor entry (laundry is the first room; bedrooms off of that), laundry window, and bathroom #3 window. Bathroom #3 will be the last one done, since that is our access to the back of the electric panel, and thus our opportunity to do generator transfer switch wiring; A/C wiring, etc. We don't expect to complete bathroom #3 until late 2009 soonest, and perhaps even as far away as Q1 2009.
Thanks again for visiting;
Ricardo y Jeeeem