Friday, March 13, 2009
When the heck will this project be done already???
Monday, February 23, 2009
Wow! The upstairs bath is tiled!
Understand thought that Marvin was doing this with fairly basic tools - eg: hand tools.
So, photo explainations. This first photo is of the shower stall area. That wood square right about showerhead level is actually looking through the window opening at the underside of the roof overhang. When the sideways louver glass window goes in, the fact that this wood is outside will be more apparent. For now, you can just catch that thin sliver of daylight at the bottom of that rectangle.
That color strip of small tiles is the same as we used on the shower floor. By doing this, we pretty much guaranteed that bathroom #3 will have somewhat different tile. No worries though, some variation will be nice.
Marvin did a perfect job getting the shower floor slope done in a way that runs all that water to the corner drain. Now, you may ask yourself, "why does he mention this?"... One of our observations for many places in Costa Rica is that whomever installs showeer floors often slopes it AWAY from the drain, not toward it. Yup, should be obvious but... Speaking of that corner drain, why is it in the USA we tend to put those drains right below the spigot? We had noticed a number of places in Costa Rica favor corner drains and have come to really like them. That little square fitting is available right in Parrita, and is what we'll use in each of our bathrooms...
popular option in Costa Rica as well. And where they are used, we found it a great way to adjust the shower temperature before having that spray of cool or ultra hot water hit our bodies. Plus, it is very useful if one is just washing feet (probably more useful in the lower levels). I think this second photo does a great job of showing the floor coloring.
When all is done, separating the shower space to the rest of the room will be a section of tempered glass with some sort of etched design on it rather than a full shower curtain. We've seen that in our friends Rob/Kent's place and really like the look. When we arrive in April, one of our early tasks will be to install the faucet and spigot/shower head. However, that tempered glass will have to wait. We have packed a spring loaded shower rod that will see duty as it makes its way into each of the bathrooms as this project unfolds.
This next photo shows the shower space transitioning to the toilet (first black pipe coming back from the shower space). The second black pipe, smaller diameter, is where the sink drains to. This will put the rest of the pipe from the sink above the floor. We weren't too excited by this, but realize that the table holding the sink, towels, and storage will cover this pipe; and found that to be a more desirable option than boxing in the ceiling of the bedroom below to accomodate this drain.
The tile above the color strip was supposed to be textured wall. Our hope was to be able to introduce other colors in the space there, and make hanging a mirror easier. Unfortunately, it is tiled. Now, having said that, we still are loving the look, and think that the result will be at least equally beautiful if not more so. Imagine a dark wood framed mirror above the sink.
None of these photos will do well to show the two light fixtures that will go on these walls. But we purchased them on Feb 22nd while doing other errands in Milwaukee. The are technically an exterior light, but with a brushed nickel finish and a bit of nautical touch to their look. In a future post I'll show all the light fixtures. Then we can have a contest to match the fixtures to locations in the casita.
For the record, the toilet and sink are white. There is a fourth tile you've already seen in the finishes post; two posts ago; that will go onto the vanity top that will add a texture which combines the colors of the accent wall tile, and the shapes of the floor tile to draw this all together.
We're excited about the prospect of the completed photos since that is not horribly far away! However, while I had this particular blog post waiting for publication time; Rob sent the photo of the now finished shower. Those two larger tiles below the color band were added in after the photos above were taken. So this bathroom is shaping up to a finish!
Thanks for reading!
Ciao!
Ricardo y Jeeeem
ps - this final photo shows the two missing pieces now installed in the upstairs shower.
Sunday, February 8, 2009
Furniture
We also got some ideas from friends homes in Costa Rica, and figure we'll apply some of those concepts as well.
After some hours of shopping, we saw the bed below, made of Guanacaste (a native Costa Rican tree; protected so it must be from a natural fall to obtain). The wood is much nicer in person than this photo conveys, but we really loved the detail and finish of this piece. We talked with the builder, and agreed to have him make complimentary side stands, taking some of the design queues he applied to this bed. This set then is the first of the furniture we bought.
Second to be purchased was a pair of leather/wood rockers along with a folding leather stool (get the image of a camp stool in your head). The leather is heavy and tooled, so presents an interesting finish. Our friends Rob and Kent have similar rockers, but with smooth leather. In part to not copy them, and in part because we like how the tooling looked, we bought a pair. But, regrettably, did not get a photo of them as the store wouldn't allow it, and we would have had to unpackage them to do a photo shoot before we left. So you'll have to wait until our late April trip to learn more.
Then we returned to one of the first stores we came to. During the day our concept of dining tables was to have a matching pair of square tables. But in the end we were liking either round or rectangular tables. The one below really caught our eye, and so we decided we would purchase it. In the same store they had some nice wood chairs with padded seat, in a pattern we could live with for a time (we assume we'll change that out before too many years pass). The backs were VERY comfortable, so we could imagine enjoying sitting in them for a long leasurely meal. We are assuming we will keep this near our kitchen, and that surface will do double duty when we need an expanded work surface. So we'll need to get a table for the veranda as well, but all in due time...
We liked this bed for its rustic feel, and are thinking of getting it or one similar for one of the first floor bedroom suites. There were complimentary side tables but I couldn't fit both the bed and side table photos in the same shot. Limited space in that store...
If we got this bed, our thinking would be to get a armour similar to this one which has hanging space above, some drawers, and a nice cabinet space with shelves. We could see this being useful for guests for who stay for a few days.
Finally, amongst Jim's favorites was this rocker we managed to get a photo of before the store owner chastised us for taking photos. This sort of style though might wind up on the lower verandas for one of the bedrooms.
Finishes

Stucco exterior starts
Well, the stucco exterior and interior has started. You can see the blue primer, and then the warm toned finish. Honestly, Jim has no clue what color this is!
We were able to see a sample of how this looks though when we were there in January. The texture is really nice. You can see a close up of it in the last photo of the first of the back to back Christmas 2008 blog postings. Consider going back and viewing that.
The final three photos are just a set looking up towards the bathroom end of the second floor. You can see the long narrow window in the wall. The glass and actual window will be four panels of double or triple louvered pieces. U
This next photo is pretty obvious, standing at the top of the stair looking down at Gerardo's truck. Mostly I took it because it give a good idea just how high up one is at the second floor looking down to the driveway. That drive is equally challenging to maneuver to drive back uphill, and out again.
This final photo is looking out off the lower bedroom veranda...
All the rough plumbing is DONE!
T
Some of the detail then in the various photos reveals subtle details. For example, that yellow pipe attached overhead is the USA type gas pipe to connect our big propane tank stored in the bodega with our gas range up in the cocina (kitchen). You can also observe the difference in keeping lines on a grid vs cross structure (blue lines) as our now fired electrician did.
In the fourth photo, you'll see some angled pipes. What this does is allow for a merger of grey water to black water. There is valving which allows our grey water to flow into the grey water holding tank for local treatment in a bio-garden (yet to be built). Or the grey water can divert into the black water, and be treated by our septic system. This is a one way conversion, so we prevent black water from entering the grey water system...
Both the white grey water pipe, and the black colored black water pipe exit under the dry bodega (that angled wall you see in the last photo). When Gerardo's crew installs the grey water tank, it will be located just below the generator room. The septic will be put in the much flatter land downhill from the casa.
Doing all this helped reveal to us some details that ultimately will help us. For example, we had assumed we would complete the retaining wall off the entry patio all the way to the building (last photo). But instead, we will alter this so against the house we can build a walkway - and a stair way cut into the hill leading downhill with some sort of concrete blocks surface as a maintenance path to the water treatment systems. We have some ideas to slightly modify our concept of the outdoor shower that we'll firm up during our next trip (we think). BTW, this final photo not only shows where the outdoor shower/boot wash will be; but the windows you're looking at are (close to far) bathroom #2, first floor entry (laundry is the first room; bedrooms off of that), laundry window, and bathroom #3 window. Bathroom #3 will be the last one done, since that is our access to the back of the electric panel, and thus our opportunity to do generator transfer switch wiring; A/C wiring, etc. We don't expect to complete bathroom #3 until late 2009 soonest, and perhaps even as far away as Q1 2009.
Thanks again for visiting;
Ricardo y Jeeeem
Flooring done upstairs
So I've some catching up to do, and since my ability to upload photos is limited for each blog, I'll spread these now over the next couple of weeks - posting about every five days or so.
We visited again in January doing part of our time work and planning, and part of our time enjoying Costa Rica and starting furniture shopping. So some postings to anticipate.During the holidays our former tile man had taken this pretty far, but not quite to the end. The holidays took him back "off the wagon" - and so Gerardo replaced him with Marvin. Marvin does beautiful work very efficiently. In the main Alazan homeowners blog site (http://alazanhoa.blogspot.com/) there is a post where roadway improvements are going in - a pair of concrete strips with other material on either side, making a stable place for vehicle wheels to track on. Marvin built the newest one which is really well done!
So post holidays, Marvin finished the stairs, and the upstairs. So these photos are to show that progress. The first one is showing the tiled steps. The rest of the metal work need the final paint, and the outside walls need finishing, but this is the glimpse of the final view. It was our intention to keep the stairs lighter in appearance and function so that air can flow over them for both cooling, and drying the steps.
The second photo in this post if from standing in the kitchen area looking out. All along we've not concentrated on clearing the vines hanging down from the trees. In this trip we finally talked through doing so; so that when we return in April this should finally be opened up. I do need to discuss with my friend John who is an acknowledged photo nut what I need to do so that the bright distance can actually be clear as we shoot photos from under the jungle canopy out across the coastal plain; we can actually see detail.
In the third photo, having stepped forward and expanding the view you can see both the living room and the bedroom doorway. We are trusting that once all the jungle vines have been removed this will appear very open. It is very easy to see when standing there. And the view DOWN from the veranda is stunning.
The final photo in this post is looking across the upper veranda. Gerardo, our contractor and Jim are in the photo. Jim was as exhausted as he looks in the photo. In our next blog, we'll talk about why that was the case!
Of course, in all of these you can see the tile floor is completed, and that was the object of this particular blog. The progress you can't see is that we worked with Marvin on setting the installation detail for all the upper bathroom tile. I am really looking forward to being able to share that post. Marvin is also working on the stucco wall finish in and out, as well as lower level floors which I know has been started as I write this.
Thanks for reading.
Ricardo y Jeeeem