The old lower retaining wall that is holding five pieces of tubo and just to the left of the formed area on the left side of the photo will be removed as it no longer serves a function in holding up earth.
J wall measurements and placement |
Alvarro and Marlon spent a good half day working out the radius and block placement options setting up the footings for the curved part of the J. In the lower right of the photo you can see the top of the block at the entry space, and the steel post the is the outer left roof support post.
rebar of J wall |
This is similar to the prior photo but from a different angle.
Thanks for reading this far, more to come soon.
Jim and Dick