This photo shows the trench largely dug out. If you double click the photo to enlarge it, you'll see a grey and white PVC crossing the trench. The dark grey one is an empty conduit for pulling power cables to provision power to a second structure "someday". The white PVC supplies water also for future structure water needs, but also to supply water to an end of drive hose bib.
This next photo is a closeup shot of the upper end of what used to be the downhill tubo for storm water. It is concreted closed from above. You can see that here, but the footings will complete the concrete from here on downhill.
This final photo shows the partially formed in trench that will become the base of the new retaining wall. The white and grey pipe has been previously described. It will remain underground, but for now appears in these photos.